HCM ELECTRICAL LTD

Ferrybridge Multifuel 2 Load Bank

HCM Electrical were awarded the contract to Project Manage and install the load bank to Ferrybridge multifuel 2.
A load bank is a piece of electrical test equipment used to simulate an electrical load, allowing you to test the performance and efficiency of a power source (like a generator or UPS) without connecting it to its normal operating load.

Work Scopes

Partners

Project Information
Budget:
£ 200K+
Date:
2022
Address:
Ferrybridge 2, Fryston Lane, Knottingley, West Yorkshire, WF11 8DX